Sunday, 26 October 2014
Demolition, Man
Week 1, basically breaking stuff. The big back room is starting to take shape, you can also see where the stairs will go in the first photo; they'll run parallel to the things holding up the ceiling.
Tuesday, 7 October 2014
Location location location
As you can't put a postcode into Google Maps, a bit more clarity below on location...you can nose around on street view at your leisure.
Donnelly's in included on the map completely by chance though I know Dad will be interested.
Donnelly's in included on the map completely by chance though I know Dad will be interested.
Tuesday, 16 September 2014
Designs
As is:
Top left and middle are the kitchen and lounge respectively. Ground floor accommodation only, two chimneys (soon to be demolished).
To be: The first picture is the loft conversion. Reading left to right: En-suite, wardrobe, bedroom, landing, office. Bottom picture is ground floor. New window apertures in yellow, existing in blue (all will have new glazing!).
To be: The first picture is the loft conversion. Reading left to right: En-suite, wardrobe, bedroom, landing, office. Bottom picture is ground floor. New window apertures in yellow, existing in blue (all will have new glazing!).
Ground zero
By popular (well, one person anyway) demand some shots of the new place which hopefully give some indication of the scale of the job!
1. Front
2. Garage
3. Rear view
4. Rear view
5. Rear
6. Front door
7. Hallway
8. Living room
9. View from living room
10. View from living room
11. Living room
12. Hall
13. Back bedroom
14. Kitchen
15. Bedroom
16. Bathroom
17. Bathroom
18. Road
19. Road
Subscribe to:
Posts (Atom)


